
https://www.colnago.com/en/configurator ... ZFwkqVhUwo


Wow
True, but you have to think that while Trek would probably have a team of several employees looking after Project One, and even Bianchi would have a few looking after Tavolozza, Colnago would probably have a single dude doing it part-time on his lunch break.
It's only been live less than 24 hours, I meant to post about it because it meant I was one step closer to getting a C64 in a colour of my choice, then I saw the options, was underwhelmed and forgot about it...
Not sure it's possible for them to get any worse...I had to wait 8-9 months for an art decor concept and then had to put in a claim to fix the crappy paint job around the headtube and seatpost, so a further 6 weeks for that to be fixed.corky wrote:
.....and what does this do to lead times?
Mine is still, as far as I know, in italy back at colnago for them to have a look at it and decide what to do with it due to the paint cracking round stress points on the Chainstay!moonoi wrote: ↑Wed Dec 05, 2018 4:57 pmNot sure it's possible for them to get any worse...I had to wait 8-9 months for an art decor concept and then had to put in a claim to fix the crappy paint job around the headtube and seatpost, so a further 6 weeks for that to be fixed.corky wrote:
.....and what does this do to lead times?
Maybe it would be better if they just sold "raw" ready to paint frames to paint as you like...something like Open does for their gravel bike, that would be a refreshing change and be truly custom paint
How long have you been waiting for such a small "fix"?chunky666 wrote: ↑Wed Dec 05, 2018 5:04 pmMine is still, as far as I know, in italy back at colnago for them to have a look at it and decide what to do with it due to the paint cracking round stress points on the Chainstay!moonoi wrote: ↑Wed Dec 05, 2018 4:57 pmNot sure it's possible for them to get any worse...I had to wait 8-9 months for an art decor concept and then had to put in a claim to fix the crappy paint job around the headtube and seatpost, so a further 6 weeks for that to be fixed.corky wrote:
.....and what does this do to lead times?
Maybe it would be better if they just sold "raw" ready to paint frames to paint as you like...something like Open does for their gravel bike, that would be a refreshing change and be truly custom paint![]()
Maybe i'll get it in time to ride next summer!