devinci wrote:bit of both, I was never able to ighlight a specific part of a ride and obtain average metrics for that specific part in GC. Marking intervals/range just like in SRMWin or WKO+ is a pretty handy feature.
You can create an interval with click and drag in the ride plot.
The intervals and associated metrics are shown in the interval bar on the left (click on the stopwatch icon at the bottom of the sidebar).
Unlike WKO+ and SRMwin we let you configure what metrics are shown, so if anything we do more than those programs. You can configure from options/preferences and select metrics and intervals.
I also struggled a lot to convert my wko+ files to GC and have them show the comments I had writen in wko+
I reverse engineered the WKO+ file format and am pretty sure we bring across ALL the WKO strings. Be very interested to know what you think is missing.
We cannot import manual rides though, but thats mostly because they don't have a corresponding .wko file anyway (they are stored in calendar.dat).